CIVIL, ARCHITECTURAL & STRUCTURAL CONSTRUCTION
Protect the Site Through Every Phase of Construction.
DIGS installs erosion and sediment controls for active construction sites, disturbed slopes, drainage corridors and completed civil improvements. Our team supports temporary and permanent BMP implementation, hydroseeding and site stabilization with practical field coordination and attention to changing conditions.
CAPABILITIES
Complete Support for the Work in Front of You
Construction BMP Installation
Project-specific erosion and sediment controls installed in accordance with approved plans and site requirements.
Perimeter and Inlet Protection
Controls that help reduce sediment migration and protect drainage systems during construction.
Slope and Soil Stabilization
Surface preparation and stabilization measures for disturbed slopes, embankments and exposed soils.
Hydroseeding
Hydroseeding for erosion control, revegetation and final site restoration based on specified seed and treatment requirements.
BMP Maintenance and Adjustments
Inspection support, repairs and field adjustments as construction progresses or site conditions change.
Final Stabilization
Removal or transition of temporary controls and completion of permanent stabilization and restoration work.





WHY DIGS
Broader Capability. Better Field Coordination.
DIGS performs erosion control within the larger context of earthwork, drainage and site restoration. This allows our crews to respond efficiently as grades change, drainage systems are installed and new areas become exposed.
Experienced Leadership
Your project is supported by construction professionals who understand planning, sequencing, safety, quality and field communication.
Self-Performed Core Work
In-house civil capabilities provide better control over connected scopes, schedule changes and final quality.
Professional Project Support
DIGS coordinates closely with owners, engineers, facility teams, specialty contractors and general contractors from mobilization through closeout.
FREQUENTLY ASKED QUESTIONS
Common Questions
Do you install both temporary and permanent BMPs?
Yes. DIGS supports temporary construction controls and permanent stabilization measures according to the approved project documents.
Can you maintain erosion controls during construction?
Maintenance and adjustment services can be included based on the project duration, access and compliance requirements.
Is hydroseeding available as part of site restoration?
Yes. Hydroseeding can be integrated with grading, erosion control and disturbed-area restoration.
DISCUSS YOUR PROJECT
Put an Experienced Class A Contractor on the Scope
Share your project location, plans, schedule and construction needs. DIGS will review the information and help define the most practical next step.
